Furnace cooling tower repairs
Hindle Mason Projects (HMP) is finalising large external concrete repairs to a furnace cooling tower on behalf of one of the country’s leading Platinum Group Metals producers. We commenced work on the project in March 2025, and we are well on track to completing it in November 2025.
HMP has extensive experience repairing these reinforced-concrete structures which endure extended exposure to deleterious agents present in the steam that they emit. These can include trace amounts of dissolved sulphates and carbonates, oxygen and carbon, metal ions and microorganisms. This is exacerbated by protracted exposure to warm, moist conditions which, when combined with chlorides or carbon dioxide, facilitates corrosion.
Notably, these structures are at greater risk of cracking than chimneys and flue stacks due to their significantly larger circumference and diameter with a much lower mass to surface area. This is due to settlement and adverse thermal temperatures imposed on the surfaces.
Working alongside the client’s engineer, HMP undertook a comprehensive structural investigation of the condition of the cooling tower after high pressure washing the substrate to remove debris and dirt. This revealed the true extent of the damage, with findings informing our cutting-edge repair methodology to restore the structure to its original state. Thereafter, we will implement an effective corrosion protection solution to prolong the structure’s design life.
We found that the concrete cover had been severely compromised due to attack by aerosolised corrosion products over a protracted period. This provides the aggressive gases direct access to the reinforcing, accelerating corrosion.
The project has entailed a myriad of technically correct repair techniques, including skimming and patching, as well as reinforcement treatment, using quality products and systems. This is after undertaking extensive surface preparation, which included surface grinding and cleaning exposed reinforcing steel.
Leaking and deteriorating concrete expansion joints are also being replaced, as well as adhesion and cohesion joint sealant failures addressed, before applying a hydrophobic impregnation to waterproof the structure.
Projects
- Bunding area concrete repair
- Concentrate thickeners rehabilitation
- Concrete bund areas built
- Concrete bund wall built
- Concrete bunded reagent plant repair
- Concrete cooling tower repairs
- Concrete pump foundations rebuilt
- Concrete inline feeder chutes repair
- Concrete refrigeration cooling tower repair
- Concrete repairs for mining equipment
- Concrete repairs in-and-around Chutes
- Concrete repairs to silo
- Concrete Silo Rehabilitation
- Concrete silos repair
- Concrete skip bay repair
- Concrete silt trap built
- Concrete strengthening for building retrofit
- Concrete tank base repair
- Concrete tank repair
- Concrete Thickeners Rehabilitation
- Concrete thickener repairs
- Flotation plant concrete repairs
- Furnace cooling tower repairs
- Mill plant gearbox installation
- Quality concrete core samples for testing
- Steel-leach tanks repair
- Steel tank wear/waterproof lining
- Tanks corrosion protection and lining
- University concrete strengthening
- Water treatment plant concrete repairs